Our Track Records - The Completed Projects

Projects Portfolio

Alloy

   

01

To supply & install new capacitor bank complete with Accessories (Temerloh RSA )

02

Rectification Traffic Light At Jeratut Junction

03

To supply and Install Eirtech LED Traffic Light at Genting Sempah Tunnel West Bound

04

To Supply and Install New Air-Conditioning Unit A1 Gombak Toll Plaza

05

Supply and Install Solenoid Valves Coil, Speed Cut- Off Relay and Alternator at Maran and Lanchang.

06

Replace Faulty Capasitor Bank at Chenor Toll Plaza

07

Replace and Faulty 250A, 415 Volt LV Main Feeder and CT Meter Panel At The Slipped Road Bentong East Interchange

08

Carry Out Service For Stanby Gen-Set (KL-Karak)

09

Install TNB Meter For All Kiosk At Temerloh Rest Services Area (East Bound)

10

Supply and Install New 30 Volt DC NI-CAD Battery For Genset

11

To Install TNB Meter For All Kiosk At Temerloh RSA (WB), Gambang RSA (WB) And Gambang RSA (EB)

12

To supply and Install, testing and CommissionningThe New Generator Parts At Lanchang Layby East Bound

13

To Supply and Install New AVR and Exciter Unit For The Stanby Generator At Maran Toll Plaza

14

Proposed Rectification And Replacement Defect Parts For The Operational Genset No.1 at Maran Layby

15

Proposed replacement of faulty electronic detector card for traffic signal sytem at plaza Toll Temerloh, Jerantut junction

16

To Replace the defect IDMT & ELR unit at Genting Sempah RSA & Bentong Toll Plaza

17

To Supply and Install Power Supply Unit, Electrical Detector Card, Green LED Light and Earthing System at Maran Toll Plaza

18

18 To Carry Out IDMT Calibration Test At Kuala Lumpur-Karak Section

19

To Supply and Replace Battery For Generator Set Along ECE 1

20

Routine Maintenance Works For Generator Set At Kuala Lumpur - Karak Highway

Grand Saga Sdn Bhd
Grand Saga Highway

   

01

Supply, Install, Testing & Commissioning UPS System 2KVA

02

To Supply and Lighting System For Motorcycle Shelter At KM 13.4 (KL Bound) Of Cheras - Kajang Highway

Tenaga Nasional Berhad (TNB)

Completed Projects

01

Kerja-kerja Pembersihan Rentis Talian Penghantaran TNB 132KV Papan Sultan Idris Power Station TN 132-171 & Sultan IdrisPower Station Temoh TN Jan-52

02

Kerja-kerja Pembersihan Rentis Talian Penghantaran TNB 132KV Taiping-Taiping Industries TN 1-7, Kuala Kangsar -Taiping Industries TN 1-76 & Kuala Kangsar Perak Hanjoong Cement TN 1-41

03

Kerja-kerja Pembersihan Rentis Talian Penghantaran TNB 132KV Papan - Sultan Idris Power Station TN 1

04

Kerja-kerja membekal, Memasang dan Memulatugas Bateri Untuk Sistem Arus Terus Di Pencawang Masuk Utama Bukit Batu 275KV untuk senggara Aset ( Selatan 2 - Kluang,) Bhg. Pengahantaran

05

Kerja Pembersihan Rentis Talian Penghantaran TNB 132KV Taiping - Taiping Industries TN 1-7, Kuala Kangsar - Taiping Industries TN1 - 81 & Kuala Kangsar - Perak Hanjoong Cement TN 1 - 41

06

Kerja-Kerja Merentang Dan Pendawaian Kabel Di PMU Desaru, Kangar Tebrau, Kukup, Kulai, Kota Puteri, Majidee, Pusat Bandar Johor Bahru, Plentong, Pekan Nenas, Penawar, Pontian, Saleng, Tampoi dan Teluk Ramunia Senggaraan Aset

07

Kerja-Kerja Membekal Dan Memasang Sistem Pembumian Pada 'Lightning Arrestor' Sebanyak 120 Unit Di PMU Tanjung Bin, Kukup, Pontian, Pekan Nenas, Taman Universiti, Skudai, Perling, Gelang Patah Dan PMU Tanjung Kupang

08

Kerja-Kerja Penebangan Pokok Bahaya Di Luar / Dalam Rentis Talian Penghantaran TNb 132KV Kuala Kangsar- Sungai Siput

09

Kerja-Kerja Penebangan Pokok Bahaya Di Luar/ Dalam Rentis Talian Penghantaran TNB 275KV Batu Gajah - Bukit Tarek

10

Kerja-Kerja Penebangan Pokok Bahaya Di Luar/ Dalam Rentis Talian Penghantaran TNB 132KV Kuala Kangsar - Papan

11

Kerja-kerja pembaikan bangunan dan kawasan

12

To supply PD 2 CTC system distributor & ball collector spare parts at Tuanku Ja'afar Power Station PD

13

To supply PD 2 CTC system distributor & ball collector spare parts at Tuanku Ja'afar Power Station PD

14

Kerja-kerja pembaikan bangunan & kawasan serta kerja-kerja berkaitan di PMU lumut maritime (LMTM)

15

Kerja-kerja memasang Narb wire, membekal & memasang danger plate serta mengecat kaki menara bagi talian 275KV BGJH-PNPN utk unit talian atas

16

GT 1A & GT 1B improve Tas-tam control circuit

17

Saft Nife HBH 98-2

18

To replace new digital mutimeter

19

Membekal dan memasang sistem pembumian pada ' Lighting Arrestor sebanyak 120 unit di PMU Tanjung Bin, Kukup, Pontian, Pekan Nenas

20

Tangga Aluminium

21

JP-3 ARC welding

22

Coupling Shaft stromag periflex 214R

23

Limit switch FR sootblower V 92 R628

24

Supply, delivery of GE spare parts to Putrajaya Power Station

25

Press Transmitter Foxboro IG P20-T22C2IN 1

26

Membekal dan gantikan display unit MCU 1000

27

Kerja-Kerja Pembaikan Bangunan Dan Kawasan Serta Kerja-Kerja Berkaitan Di PMU Pengkalan PKLN

28

Kerja-kerja membekal, memasang dan memulatugas satu bank bateri untuk sistem arus terus bagi PMU Sri Gading 132/11kv, Parit Yusof 132/11kv dan dan Johor Tengah 132/11kv dibawah senggaraan Aset Selatan 2 Kluang

29

Kerja-kerja Pembaikan Bangunan dan Kawasan serta Kerja-kerja yang berkaitan Di pencawang Masuk Utama Gopeng Road (GPRD) untuk Unit Pencawang Jabatan Senggaraan Aset (Utara 3- Ipoh)

30

Kerja-kerja Membekal, Memasang, Menguji dan Memulatugas Satu (1) Banka Bateri Di Pencawang Masuk Utama Bagan Serai 132KV Untuk Senggaraan Aset (Utara 3 - Ipoh)

31

Kerja-kerja Membekal, Memasang Menguji Dan Memulatugas Satu (1) Banka Bateri Di Pencawang Masuk Utama Batu Gajah 275KV Untuk Senggaraan Aset (Utara 3-Ipoh)

32

Kerja-kerja Membekal, Memasang Menguji Dan Memulatugas Satu (1) Banka Bateri Di Pencawang Masuk Utama Gopeng Road (GPRD) Untuk Senggaraan Aset (Utara 3-Ipoh)

33

Kerja-kerja Membekal, Memasang Menguji Dan Memulatugas Satu (1) Banka Bateri Di Pencawang Masuk Utama Seri Iskandar 132Kv Untuk Senggaraan Aset (Utara 3-Ipoh)

34

Kerja-kerja Membekal, Memasang Menguji Dan Memulatugas Satu (1) Banka Bateri Di Pencawang Masuk Utama Temenggor 275Kv Untuk Senggaraan Aset (Utara 3-Ipoh)

35

Kerja-kerja Penebangan Pokok Bahaya Di Luar/ Dalam Rentis Talian Penghantaran TNB 132kV Temoh - Kg. Gajah Pakej 14

36

Kerja-kerja Penebangan Pokok Bahaya Di Luar/ Dalam Rentis Talian Penghantaran TNB 275kV Bukit Merah - Kuala Kangsar & 132kV Bagan Serai - Bukit Merah

37

Kerja-kerja Penebangan Pokok Bahaya Di Luar/ Dalam Rentis Talian Penghantaran TNB 132kV Silibin GIS - Tasek Cement, 132kV Kuala Kangsar - Perak Hanjoong , 132kV Lumut - Lumut Maritime & 275kV Ayer Tawar - Batu Gajah Pakej 18

38

Kerja-kerja Penebangan Pokok Bahaya Di Luar/ Dalam Rentis Talian Penghantaran TNB 275kV Bg. Gajah - Papan Pakej 17.

39

Kerja-kerja Penebangan Pokok Bahaya Di Luar/ Dalam Rentis Talian Penghantaran TNB 132kV Pengkalan Industries - Sultan Idris Power Station

 

CURRENT PROJECTs

01

Pembekalan dan Pengiriman Battery Charger 30V 10A C/W

02

Pembekalan & Pengiriman "Battery Cell 30V 40AH"

03

Kerja-kerja Penebangan Pokok Bahaya Di Luar/ Dalam Rentis Talian Penghantaran TNB 132kV Taiping Industries - Kuala Kangsar, 132kV T-Off Kamunting & 132kV Sg. Siput - Lower Piah Pakej 19.

04

Kerja-kerja Penebangan Pokok Bahaya Di Luar/ Dalam Rentis Talian Penghantaran TNB 275kV Temenggor - Kuala Kangsar & 275kV Temenggor - Pergau Pakej 13

Maxis

   

01

Installation and Maintenance Works on Underground Frequency System (Tunnel) for Maxis

Jabatan Kerja Raya (JKR)
JKR Hulu Langat, Kajang
JKR Seremban

   

01

Supply, Install, Testing & Commissioning of Traffic Lights System at Persimpangan Jalan Mantin - Jalan Lenggeng · JKR Seremban

02

Supply, Install, Testing & Commissioning of Traffic Light System at Simpang Empat Jalan Juasseh - Bahau · JKR Hulu Langat, Kajang

03

Supply, Install, Testing & Commissioning of Traffic Light System at Persimpangan Jalan Persekutuan FT001/362/20 - Jalan Simpang Balak · JKR Hulu Langat, Kajang

04

Add wiring SCATS system from Line Isolation - SCATCOM16 Modem- Communication unit · JKR Seremban

05

Installation traffic light system at Persimpangan Jalan Seremban - kuala Pilah / Taman Ampangan (FT51) · JKR Seremban

06

Installation traffic light system at Persimpangan Jalan Tun Dr. Ismail / Taman Makmur (FT01) · JKR Seremban

07

Maintenance for Dammaged Materials Cause of an Accident at Traffic Lights Junction Seksyen 290.3 Jalan Seremban - Tampin / Pekan Rembau, Daerah Rembau, Negeri Sembilan · JKR Seremban

08

To Propose Electrical Maintenance fo Traffic Light Junction at Seremban and Port Dickson, Negeri Sembilan Darul Khusus · JKR Seremban

Majlis Perbandaran Selayang (MPS)

   

01

Supply, Install, Testing & Commissioning Traffic Lights System at Jalan Utama, Taman Ehsan.

Majlis Bandaraya Petaling Jaya (MBPJ)

   

01

Supply, Install, Testing & Commissioning Traffic Lights System at Persimpangan 4 (SS 1/1, SS 1/4, SS 1/11) Kg Tunku, Petaling Jaya

02

Supply, Install, Testing & Commissioning of Traffic Lights System at Jalan Universiti - Jalan Bukit (PPUM) Petaling Jaya to smart control system

03

Supply and install new traffic light system at Persimpangan 4 (SS 3/14- SS 3/29) SS3, Petaling Jaya

04

To Propose Traffic Light Maintainance at MBPJ for 2 + 1 years.

05

To Supply and Install Interlocking Pavers and Painting Line Road by Using Hot Applied Thermoplastix and others Works at SS8/2, Petaling Kaya

06

Kerja Membaiki Longkang, Dinding Batu/ Bata dan Lain-lain Kerja Berkaitan Di Jalan 19/13A, 19/20 dan Kawasan Sekitarnya, Petaling Jaya

07

9 To Propose Traffic Light Maintainance at MBPJ for 2 + 1 years (Extension for 1 year)

08

Cadangan Kerja-Kerja Membekal Dan Memasang Sistem Lampu Isyarat Yang Baru Untuk Lintasan Pejalan Kaki Di hadapan Sekolah (P) Assunta,
Jalan Changai, Petaling Jaya Untuk Tetuan Majlis Bandaraya Petaling Jaya

09

Cadangan Penyelenggaraan Lampu Isyarat Di Seluruh Kawasan Persimpangan Trafik Di Bawah Pentadbiran MBPJ Bagi Tempoh kontark 2+1 Tahun Untuk MBPJ (Lanjutan Untuk Tempoh 4 Bulan)

10

Cadangan kerja-kerja penyelenggaraan lampu isyarat ( Zon A) bagi tempoh setahun untuk Majlis Bandaraya Petaling Jaya

11

Kerja Memasang Grating Konkrit Pratuang Untuk Mengganti Semula Jeriji Besi (Sump) yang hilang/rosak dan lain-lain kerja berkaitan di Jalan 8/1, Jalan 14/20, Jalan 222 dan Kawasan sekitarnya Petaling Jaya

12

Cadangan Kerja Segera Membina Struktur Penyurut Halaju Aliran Parit Utama Berhampiran Jalan SS 4D/2 Dan Kerja Lain Yang Berkaitan Bagi Mengatasi Banjir Kilat Di Kawasan Hilir Jalan SS 4D/10, Petaling Jaya.

13

Cadangan Menaiktaraf Persimpangan Lampu Isyarat Sediada Di Persiaran Bandar Utama - Dataran Bandar Utama (TV3), Bandar Utama Petaling Jaya Untuk MBPJ

14

Cadangan Kerja Menaiktaraf Persimpangan Lampu Isyarat Sediaada Di Jalan SS 1/11 - Jalan SS 1/22 Kg. Tunku, SS 1, Petalling Jaya untuk MBPJ

15

Cadangan Tawaran Semula Kerja-kerja Menaiktaraf Persimpangan Lampu Isyarat Sediada Di Jalan Dato' Abu Bakar - Jalan 16/6, Seksyen 16, Petaling Jaya untuk Majlis Bandaraya Petaling Jaya

16

Cadangan Kerja Membaiki dan Menaiktaraf Parit Tepi Jalan dan Kerja-kerja lain Yang Berkaitan Di Jalan SS 23/6, SS 23/6A, SS 23/6B dan Kawasan Sekitarnya, SS 23 Petaling Jaya (sektor 2)

Majlis Bandaraya Shah Alam (MBSA)

   

01

Kerja-Kerja Membaiki Kerosakan Lampu Isyarat

02

Kerja-kerja Membaiki Kerosakan Lampu Isyarat SA 18 (Persiran Masjid - Kolej Jati, UITM)

03

Kerja-kerja Membaiki Kerosakan Lampu Isyarat SA 24 )Pers. Sukan /Jln 13/18

Majlis Perbandaran Subang Jaya (MPSJ)

   

01

To Supply & Install Pedestrian Crossing Traffic Light System At Jalan Bandar Puchong Jaya, Selangor

02

Sistem Lampu Isyarat Pejalan Kaki Di Persiaran Puchong Utama

03

Memasang dan membekal sistem lampu isyarat pejalan kaki di Lagun Timur

04

To proposed Traffic Light Maintenance for 2008 (Phase 2) at Zon A area for MPSJ

05

Kerja-kerja Membekal & Memasang Sistem Lampu Isyarat Di Persimpangan Jalan Subang 5, Subang Jaya Selangor Darul Ehsan

06

Sistem Lampu Isyarat Pejalan Kaki Di Persiaran Puchong Utama

07

Memasang dan Membekal Sistem Lampu Isyarat Pejalan Kaki Di Lagun Timur

08

Kerja-Kerja Penyelenggaraan Lampu Isyarat Selama Setahun Bagi Tahun 2010 Di Kawasan Zon 4, Subang Jaya Untuk MPSJ

Perbadanan Kemajuan Negeri Selangor (PKNS)

   

01

Repair Works on Broken Traffic Light at Persimpangan C, D, H and I

02

Repair Works on Broken Traffic Light at Persimpangan A, B, E, F and G

03

Cadangan Pemasangan Lampu Isyarat Di Persimpangan Jalan Kenyalang 11/1 Dan Jalan Kenyalang 11/3, Seksyen 11, Kota Damansara

04

Cadangan Kerjs-kerja membuka, Membekal dan Memasang Baru Talang Air Hujan, Membaiki Apron Pecah dan lain-lain Kerja Berkaitan Block 9, Pangsapuri Jalan 6C/9, Seksyen 16, Bandar Baru Bangi, Selangor Darul Ehsan.

05

Cadangan Kerjs-kerja membuka, Membekal dan Memasang Baru Talang Air Hujan, Membaiki Apron Pecah dan lain-lain Kerja Berkaitan Block 7, Pangsapuri Jalan 6C/9, Seksyen 16, Bandar Baru Bangi, Selangor Darul Ehsan.

Prolintas Expressway Sdn Bhd

   

01

Repair and rewiring motorcycle tunnels lighting at Bukit Jelutong, Subang

02

Kerja-kerja merentang kabel, memotong jalan dan kerja-kerja berkaitan

03

Routine Service and Maintenance For Lighting System Along Guthrie Corridor Expressway For Prolintas Expressway Sdn. Bhd.

SMART

   

01

Reinstate pothole

02

To Repair Bulging at SC 1.15

03

To Supply labour, tool , material and equipment to install 400 x425 x 3m aluminium kilometer marker signboard with Avery HIP reflective sheeting

04

To Supply of labours, materials, tools, machineries, and all necessary equipment for the completion of the works (Proper survey need to be done prior to commence the following works: Groove line Drainage

Tyco Fire & Security

   

01

Traffic Signal System At Jln PJS 8/8 - Jalan PJS 8/9 Mentari Business Park

Shortcut